Spark DriveTransport & General Contracting LLC← Back to website

Field photographs

Built on site.
Seen in detail.

48 selected photographs of construction work and site experience. Photographs are grouped by work type and are not individually assigned to named contract records. Browse protection systems, drainage and civil works by work type.

Tower & slopeStone pitchingGabionsCivil & drainage
01 / 04

Tower and slope protection

13 photographs

Tower foundation slope protection
01Tower foundation slope protection
Protected transmission tower foundation
03Protected transmission tower foundation
Tower foundation edge preparation
04Tower foundation edge preparation
Stone protection beneath a transmission tower
05Stone protection beneath a transmission tower
Completed tower embankment
06Completed tower embankment
Stone pitching beside utility fencing
07Stone pitching beside utility fencing
Finished stone pitching along fence
08Finished stone pitching along fence
Protection around utility compound
09Protection around utility compound
Reinforcement on inclined slope
10Reinforcement on inclined slope
Slope reinforcement detail
11Slope reinforcement detail
Reinforced tower embankment
12Reinforced tower embankment
Blinding and rock protection at tower
13Blinding and rock protection at tower
Gabion protection at site boundary
14Gabion protection at site boundary
02 / 04

Stone pitching and rock protection

13 photographs

Stone pitching at utility compound
01Stone pitching at utility compound
Broad stone protection installation
02Broad stone protection installation
Stone lined drainage channel
03Stone lined drainage channel
Gabion edge under construction
04Gabion edge under construction
Stone pitching on embankment
05Stone pitching on embankment
Completed stone pitching surface
06Completed stone pitching surface
Rock protection along drainage corridor
07Rock protection along drainage corridor
Finished stone lined slope
08Finished stone lined slope
Stone protection beside channel
09Stone protection beside channel
Stone protection work in progress
10Stone protection work in progress
Stepped stone lining on slope
11Stepped stone lining on slope
Placed rock for protection works
12Placed rock for protection works
Stone pitching close-up
13Stone pitching close-up
03 / 04

Gabions and retaining works

08 photographs

Gabion structure at drainage crossing
01Gabion structure at drainage crossing
Gabion reinforcement cage
02Gabion reinforcement cage
Gabion headwall construction
03Gabion headwall construction
Stone material for gabion installation
04Stone material for gabion installation
Gabion structure beside trench
05Gabion structure beside trench
Stone retaining edge beside roadway
06Stone retaining edge beside roadway
Stone lining during installation
07Stone lining during installation
Gabion retaining structure close-up
08Gabion retaining structure close-up
04 / 04

Civil, drainage and site works

14 photographs

Concrete slab reinforcement
02Concrete slab reinforcement
Drainage chamber installation
03Drainage chamber installation
Steel reinforcement stock at site
04Steel reinforcement stock at site
Drainage chamber excavation
05Drainage chamber excavation
Stone paving detail
06Stone paving detail
Stone walkway and external works
07Stone walkway and external works
Concrete drainage edge
08Concrete drainage edge
Concrete kerb installation
09Concrete kerb installation
Drainage trench excavation
10Drainage trench excavation
Stone retaining wall construction
11Stone retaining wall construction
Concrete works under construction
12Concrete works under construction
Roadside drainage channel
13Roadside drainage channel
Stormwater retention pond
14Stormwater retention pond
Earthworks and grading
15Earthworks and grading

Spark Drive

Transport & General Contracting LLC

Discuss a projectsparkdrive.ad@gmail.com
Call+971 50 664 4904

Al Ain, Abu Dhabi, United Arab Emirates

Back to top ↑